This project is located in Wan Dan Province, Java island, Indonesia, about 100 km from Jakarta. The total investment of the project is RMB 12 billion yuan (US $1 billion 883 million) and the total installed capacity is 2 * 1050MW. After the project has been put into operation, the annual generating capacity is about 15 billion kwh, and the "D contract section of Shenhua Guohua 2 J. 7 1050MW coal-fired power generation project D unit" and the civil engineering contract for the coal handling system are signed by China thermal power construction group Zhejiang Thermal Power Construction Co., Ltd. and Fu Dong Construction Co., Ltd. in February 2017. The main service contents are: Shenhua Guohua Java 7, 2 * 1050MW coal-fired power generation project D stage 1# unit, main body and coal handling system civil engineering, Plant Road and flood prevention wall project, ash storage works.