This project is located in the power generation industrial park of the economic development zone of the tea industry, which is about 190 kilometers away from Hu Zhiming, with a total installed capacity of 2 x 660MW project. The two phase of the 2 phase 660MW coal-fired power generation project of the Vietnam coast is C3 civil engineering contract. The contract is signed by China Energy Construction Group Anhui Electric Power Construction First Engineering Co., Ltd. and Fu Dong Construction Co., Ltd. in July 2019. The main service contents are coal supply system (including the first land transfer station, coal yard project, coal feeding system), the chemical water treatment system (excluding 1#, 2# condensate water treatment system), fire fighting system, fuel system, waste water system in BOP, ash removal system (excluding 1#, 2# dry slag removal system), tower structure, other auxiliary buildings (start boiler, hydrogen production station, liquid ammonia storage and transportation system, condensate tank, pipe rack, pipe pier, material library, maintenance room, chlorine making workshop, garage, fire garage).
Project duration: 03 -2021 30 November 19, 2018